<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
 <channel>
  <title>Timber Creek Railroad: Blog</title>
  <link>http://timbercreekrr.zoomshare.com/2.shtml</link>
  <description>Timber Creek Railroad: Blog</description>
  <lastBuildDate>Fri, 20 Jun 2008 02:17:17 -0500</lastBuildDate>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/a088baf98919310893c1868b92956b3c_485b4ce6.writeback</link>
   <title>Gold Spike Ceremony. . .</title>
   <pubDate>Fri, 20 Jun 2008 01:23:34 -0500</pubDate>
   <description>The 14th day of June, 2008 was my &quot;Gold Spike&quot; 
ceremony for the outdoor 7.5&quot; gauge Timber Creek 
Railroad The visitor Locomotives consisted of Two 
GP-9&#39;s, one was an SP and the other was a WP; one 
Southern Pacific Atlantic #3001; and my own 
Timber Creek Railroad SW-1500 #1046. The actual 
ceremony was after lunch and everyone 
participated in driving in the Gold Spike. It 
started at about 9AM and ended at about 4PM. A 
good time was had by all. Pictures will be in the 
TCRR outdoor RR album.
The GOLD SPIKE has been planted!!!!!!</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/11a7f98fe8b41d537f896a183414ce4d_4803b1b1.writeback</link>
   <title>More track ! ! !</title>
   <pubDate>Mon, 14 Apr 2008 14:34:09 -0500</pubDate>
   <description>I just recently laid down another 60 feet of 
track where the first switchback is located..
It&#39;s all done and ballasted.

Later,
Gordon</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/5649216cb383c5175f4e9bf20d14b74e_4803b0dd.writeback</link>
   <title>Road Crossing Signal</title>
   <pubDate>Mon, 14 Apr 2008 14:30:37 -0500</pubDate>
   <description>Finally got the grade crossing signal to work.
I insulated one side of the rail to allow the 
train to act as a switch to activate the signal 
as it passes the drive way.</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/3972ba0e982fa5b118803e8abfb49919_4803b00c.writeback</link>
   <title>Transfer table</title>
   <pubDate>Mon, 14 Apr 2008 14:27:08 -0500</pubDate>
   <description>I repainted the transfer table because of a can 
of black spray paint that fell from the transfer 
table and was puntured when it hit a sharp corner 
and sprayed the table real bad.</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/11db56d4ea8d64b148a3ae85c67f09e4_4803af36.writeback</link>
   <title>Switch Stand</title>
   <pubDate>Mon, 14 Apr 2008 14:23:34 -0500</pubDate>
   <description>I just rebuilt and painted my switch stand that 
stands outside of my train building where the &quot;O&quot; 
scale railroad is housed. It is now &quot;lighted&quot;.</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/b3b08291eda1cef769b56afefd8b6205_47eee69e.writeback</link>
   <title>Model Ships</title>
   <pubDate>Sat, 29 Mar 2008 20:02:22 -0500</pubDate>
   <description>Added a new catagory called Model Ships. I am in 
the process of building another 1/4&quot; scale 
Destroyer like the #783 that is pictured in the 
album. This ship will be a little different as it 
is a Fletcher class (94 1/2&quot; long) instead of the 
Gearing class (97 1/2&quot; long) pictured.  
   The one numbered 729 was my first ship that I 
built back in the 70&#39;s and it is 1/2&quot; scale at a 
little under 8&#39;, at 92&quot; long. The one&#39;s numbered 
446 and 552 are Blue Devil Destroyers in 1/125 
scale. They are later style Fletcher class 
Destroyers. I own the 446, and my friend owns the 
552.
</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/7cade5ef2821d9761482f1ea1fcfaa47_47ed1661.writeback</link>
   <title>Mars lights. . .</title>
   <pubDate>Fri, 28 Mar 2008 11:01:37 -0500</pubDate>
   <description>I have 3 more Mars Lights for sale that I just 
finished. You can see them on Dicover Live 
Steam&#39;s Web site. </description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/4eeb37c7d32f6346993dc77e65f7b637_47ed15dd.writeback</link>
   <title>laying track</title>
   <pubDate>Fri, 28 Mar 2008 10:59:25 -0500</pubDate>
   <description>Yesterday I put down 60&#39; more track on the first 
switch back and I just need to ballast and pin 
down the trackwork.</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/e22174d07bffd86e4677be142cace614_4749fd8a.writeback</link>
   <title>Mars Lights. . .</title>
   <pubDate>Sun, 25 Nov 2007 16:56:10 -0600</pubDate>
   <description>As of November 24th, all the Mars Lights have 
been sold out. I have two more on the work bench 
that will be produced when needed for a sale.
All for now, will keep you posted. . .</description>
  </item>
  <item>
   <link>http://timbercreekrr.zoomshare.com/2.shtml/e63a84278a0e8102b5852f0a492f4078_47127447.writeback</link>
   <title>Brakes...</title>
   <pubDate>Sun, 14 Oct 2007 14:55:51 -0500</pubDate>
   <description>I just received two sets of air brakes from MCC 
and installed them on my gondola and tank car. 
Now Train Mountain won&#39;t be bad coming down those 
notorious grades! Now, my Engineer car is fully 
utilized as I have air for the train brakes
(finally!!)and air for pumping water from my tank 
car for fire fighting or filling a thirsty 
steamer tender.
I&#39;ve also finished letering and numbering the 
rest of the rolling stock that I have in my train.
I&#39;ll have some pic&#39;s at a later date.
All for now.</description>
  </item>
 </channel>
</rss>
